Skip to content
  • FlexRICAN
    • ABOUT
    • WORK PACKAGES
    • DELIVERABLES AND MILESTONES
    • Consortium
  • NEWS & EVENTS
    • NEWS
    • EVENTS
  • CONTACT
  • FlexRICAN
    • ABOUT
    • WORK PACKAGES
    • DELIVERABLES AND MILESTONES
    • Consortium
  • NEWS & EVENTS
    • NEWS
    • EVENTS
  • CONTACT
Work Packages

WORK PACKAGE 7: Implementation of Flexibility & Carbon Reducing Solutions

The consortium includes RIs that have different energy management needs and thus cross-sectionally represent a broad implementation range within the RIs. For ELI the main carbon footprint comes from maintaining the indoor environment of the building (air-controlled condition and services to lasers) as for EMFL comes from the research instruments themselves (the high field magnets).

This WP aims at creating common tools to implement the results from WP6 and at the same time to cover the different needs for carbon footprint reduction arising from the multi-platform representation of RIs in the consortium. This will expand the applicability of the outputs from the whole project.

The validated results of the implementation of the Tasks on the already operating ELI and EMFL facilities will then be used to optimize the ESS commissioning (2025-2026), which brings together the needs from all 3 Tasks.

Work Package Leader

Roman Kuřátko

ELI Beamlines Facility

Deliverables

  • D13 - D7.1 Open source control algorithms platform for BMS, optimized for RIs, programmed in DIN 66025, IEC 61131-3, IEC 61508 standards
  • D14 - D7.2 A streamlined cooling/dehumidification technological chain
  • D15 - D7.3 Report on LCA of high field magnets

Milestones

  • M9 Open access database of program blocks
  • M10 Functional prototype of technology chain (Compressor, exchanger, medium)
  • M11 Presentation of the structuration of the final report on carbon print gains

Work Packages

  • WORK PACKAGE 1: Project Management 1
  • WORK PACKAGE 2: Project Management 2
  • WORK PACKAGE 3: Renewable Energy Production at RIs
  • WORK PACKAGE 4: Efficient Use of Battery Arrays
  • WORK PACKAGE 5: Waste Heat Recovery
  • WORK PACKAGE 6: Energy Flexibility
  • WORK PACKAGE 8: Communication, Dissemination, Exploitation, Stakeholder Engagement and Training Activities 1
  • WORK PACKAGE 9: Communication, Dissemination, Exploitation, Stakeholder Engagement and Training Activities 2
FlexRICAN - Logo and disclaimer banner

Follow us on

Navigation

  • Home
  • About
  • News
  • Events
  • Home
  • About
  • News
  • Events
  • Work packages
  • Deliverables And Milestones
  • Consortium
  • Work packages
  • Deliverables And Milestones
  • Consortium
  • FlexRICAN
    • ABOUT
    • WORK PACKAGES
    • DELIVERABLES AND MILESTONES
    • Consortium
  • NEWS & EVENTS
    • NEWS
    • EVENTS
  • CONTACT